Predevelopment Architectural phase, Multiple units Feasibility Study, Planning and Zoning

Closed Posted 6 years ago Paid on delivery
Closed Paid on delivery

We need to get all information on Predevelopment phase of two different zoning land in city of LOS ANGELES, CA.

Are plane is to build on these two projects, both multi-unit rental buildings. The scope of each project will be determined through the pre-development and feasibility process based on applicable regulations with the goal of maximum efficiency and highest and best use. Budget is to-be-determined

SERVICES

For the initial Predevelopment phase the architect will: 1. Review all relevant Planning and Zoning documentation which has bearing on this project. 2. Review potential building size, unit quantities, parking plans and associated zoning and planning department issues to help the owner determine and or confirm maximum and reasonable potential development parameters for the project. 3. Explore preliminary building massing and concept plans associated with options and potentially available incentives to determine most efficient design option.

Architect to provide 4 scenarios for due diligence steps 1-6 below:

1. without density bonus

2. with Density Bonus

3. with TOC

4. With any other “bonus” scenarios from city that benefits owner

Description of “Due Diligence” Work to Be Performed as feasibility study. All necessary information needed to start the project with its permits minus the architectural planning, including but not limited to the following:

1. How many units owner can build with or without bonus and how many square feet owner can build, all to be based on highest and best use cost study.

2. Parking plan and Area study (how many parking spots are needed with or without bonuses and how many floors down are recommended based on highest and best use)

3. One Visit to the Dept. of Building & Safety for Planning & Zoning, DOT requirements

4. Comprehensive summary regarding setbacks in all 4 scenarios outlined above.

5. List of all different permits and studies that we will need: all due diligence before applying for permit (geological, air quality, etc.)

6. Cost for all the actual permits and studies.

Basic information of two land.

Building 1.• 7,743.8sf R4-1 TOC Tier 3 • Buildable area: 5000sf • FAR 3:1 for 15,000sf with 50% increase per TOC = 22,500sf • Units: @ 400sf each = 19.35 x 70% increase per TOC = 33 units

Second one.. • 6,750sf R4-2 TOC Tier 3 • Buildable area: 4200sf • FAR 6:1 for 25,200sf with 50% increase per TOC = 37,800sf • Units: @ 400sf each = 16.9 with 70% increase per TOC = 29 units

All report has send on Microsoft word, with city code.

AutoCAD Building Architecture Building Design Engineering Drawing Structural Engineering

Project ID: #15454525

About the project

9 proposals Active 6 years ago

Location: Los Angeles, United States

9 freelancers are bidding on average $1480 for this job

wycccka

I am an architect mostly working with projects at pre-zonig and zoning phase in California. Usually I do code analysis, parking layout, and evaluate maximum building size. Later preliminary drawing set is created inclu More

$2000 USD in 22 days
(9 Reviews)
6.2
ArchAls2Gd

Dear Client. I am an Architect and have over 15 ears experience in designing buildings and Interiors as well as any form of Graphic Designing Please note that we analysis the project carefully, do proper research and More

$750 USD in 7 days
(60 Reviews)
5.2
Arkhitekton007

SPECIALIST ARCHITECT & BIM PROFESSIONAL Successful track record of executing prestigious projects within defined cost/time parameters, managing entire operations Relevant Skills and Experience AutoCAD, Building Archit More

$750 USD in 10 days
(13 Reviews)
4.7
sheak

Hello! We are extremely interested in this project and would love to work on this project, please reply back to discuss further. Looking forward to hearing from you soon. Thanks!

$1500 USD in 30 days
(2 Reviews)
3.2
laertrreza2

A proposal has not yet been provided

$1111 USD in 20 days
(0 Reviews)
0.0
m2kia6

A proposal has not yet been provided

$1250 USD in 20 days
(0 Reviews)
0.0