design project on production surface product

Cancelled Posted Feb 20, 2014 Paid on delivery
Cancelled Paid on delivery

This will be a more detailed study of one or more parts of the reservoir or surface installation.

For example, it may include the detailed design of the oil/gas/water separator or a gas-processing unit

Engineering Petroleum Engineering Product Design Report Writing

Project ID: #5465725

About the project

2 proposals Remote project Active Feb 20, 2014

2 freelancers are bidding on average $528 for this job

VirtualBrainInc

A proposal has not yet been provided

$500 USD in 10 days
(6 Reviews)
3.9
Bretty

A proposal has not yet been provided

$555 USD in 10 days
(0 Reviews)
0.0